Alrashdi M.
Whitmore Lab
Renovation
Pennsylvania State University
Whitmore Lab Phase I & II Renovations
Latest Updates
-
09-02-15/ AE Department Thank You letter was sent to the contact personnel
-
09-04-15/ Building Statistics was submitted to the dropbox
-
09-16-15/ Technical Report I was posted.
-
09-18-15/ Student Biography was posted.
-
10-02-15/ Building Abstract was posted.
-
10-16-15/ Technical report II was posted.
-
10-26-15/ Building Abstract was revised.
-
10-26-15/ Building Statistics II was posted.
-
12-07-15/ Technical Report III was posted.
-
12-11-15/ Thesis Proposal was posted.
-
01-18-16/ Thesis Revised Proposal was posted.
-
01-25-16/ Breadth topics were revised.
-
03-30-16/ Presentaion outline and sample are were posted.
-
03-5-2016/ Final report was posted.
-
04-13-16/ Final Presentation was posted.
-
04-29-2016/ Reflection was posted.
-
04-29-2016/ Checklist was completed. Website is ready for evaluation.